Date: Thu, 28 Mar 2024 08:17:32 -0400 (EDT) Message-ID: <276813357.668.1711628252278@ip-10-208-27-219.ec2.internal> Subject: Exported From Confluence MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_Part_667_1944104758.1711628252268" ------=_Part_667_1944104758.1711628252268 Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable Content-Location: file:///C:/exported.html
Author: Traci St.Martin, Tom Johnson
Email:<=
/strong> stmartin.traci@mayo.edu
Team: LexEVS
Client: NCI CBIIT
National Institutes of Heath
US Department of Health and Human Services
Sign off |
Date |
Role |
CBIIT or Stakeholder Organization |
---|---|---|---|
Johnita Beasley |
11/11/2008 |
Overall EVS Technical Lead |
NCI EVS |
Gilberto Fragoso |
11/18/2008 |
EVS Infrastructure |
NCI EVS |
Frank Hartel |
11/17/2008 |
EVS Product Manager |
NCI EVS |
The purpose of this document is to collect, analyze, an= d define high-level needs and features of the National Cancer Institute Cen= ter for Biomedical Informatics and Information Technology (NCI CBIIT) caCOR= E LexEVS Release 5.0. This document focuses on the functionalities proposed= by the product stakeholders and target users in order to make it a better = product. The use-case and supplementary specifications document will detail= how the framework will fulfill these needs.
The objective of this release of the LexEVS 5.0 is to:<= /p>
EVS 4.2
LexEVS 5.0
Each enhancement, modification or new feature is described in detail bel= ow.
GForge number |
Brief description of functional requirement <= br class=3D"atl-forced-newline"> (enhancement or new feature) |
Iteration |
---|---|---|
Model revisions & readiness for Silver/Go= ld Compatibility (scope modified & approved 1/14/09) |
=E2=80=94 |
|
Data Services - SDK |
=E2=80=94 |
|
Build and Deployment process complete |
=E2=80=94 |
|
2009/01 model changes: (please see Gforge= tracker for more detail on the nature of the changes and further descripti= ons)
|
=E2=80=94 |
Each bug fix included in this release is described in detail below.
GForge number |
Brief description of bug |
Iteration |
---|---|---|
Implement getAssociation for EVS API web serv= ice |
=E2=80=94 |
|
Remove convenience methods for nameToCode = |
=E2=80=94 |
|
Two constructors create ConceptReferenceList = methods throw exceptions |
=E2=80=94 |
|
Example to dump/query auxiliary metadata <= /td> | =E2=80=94 |
|
Better error handling for invalid search crit= eria in http interface |
=E2=80=94 |
|
Javadocs should open in new window |
=E2=80=94 |
|
Import RRF representation of relationship gro= ups |
=E2=80=94 |
|
Users should have the ability to request Sear= ch results be sorted |
=E2=80=94 |
|
CodingSchemeID not present in exported LexGri= d XML |
=E2=80=94 |
|
Unified OWL loader |
=E2=80=94 |
|
Remove JUnit test dependency on 'Automobiles'= vocab for LexEVS Grid Services |
=E2=80=94 |
|
Change -nf option to -fe (fail on error) <= /td> | =E2=80=94 |
|
EntityDescription not assigned to the NCI PT = (rdfs:label) using Scrubber output |
=E2=80=94 |
This section describes in detail all the related requirements which must= be met for this release but do not add functionality. These requirements a= re included in the scope and project plan due to level of effort or relativ= e importance to the overall success of delivery of the release.
GForge number (hyperlinked) |
Brief description of non-functional requireme= nt |
Iteration |
---|---|---|
Project plan for 5.0 |
=E2=80=94 |
|
Release notes for 5.0 |
=E2=80=94 |
|
Update Tech and Admin Guide for 5.0 |
=E2=80=94 |
|
Create Migration Guide for 5.0 |
=E2=80=94 |
|
Deployment to Dev Tier |
=E2=80=94 |
|
Deployment to QA Tier |
=E2=80=94 |
|
Deployment to Stage Tier |
=E2=80=94 |
|
Deployment to Production Tier |
=E2=80=94 |
This section describes in detail all the related activities which must b= e performed for this release but do not add functionality. These activities= are included in the scope and project plan due to level of effort or relat= ive importance to the overall success of delivery of the release.
GForge number (hyperlinked) |
Brief description of general support activity= |
Iteration |
---|---|---|
=E2=80=94 |
caDSR Support |
=E2=80=94 |
=E2=80=94 |
MDR Support |
=E2=80=94 |
=E2=80=94 |
Training and support for users migrating to L= exEVS 5.0 (development team & VKC collaboration/dependency) | =E2=80=94 |
Customer Name |
Role |
Interest/Need |
---|---|---|
George Komatsoulis |
NCICB Application Infrastructure |
Oversees NCICB Application Infrastructure = |
Avinash Shanbhag |
NCICB Application Infrastructure |
Oversees NCICB caCORE Software Engineering |
Frank Hartel |
EVS Product Manager |
Directs EVS Projects |
Denise Warzel |
CORE Product Line Manager |
Trans-CORE requirement coordination |
Gilberto Fragoso |
Associate Director EVS Infrastructure |
Technical Direction |
Wil Garcia |
Project Manager/Technical |
Technical Direction and Implementation |
Charles Griffin |
Overall LexEVS Project Manager |
Project schedule and task management |
Tom Johnson |
Mayo Clinic Technical Project Manager/Enginee= ring Lead |
Technical Direction and Implementation |
Traci St.Martin |
Mayo Clinic Project Manager |
Project schedule and task management |
CBIIT Staff/Contractor Name |
Role |
Responsibilities |
---|---|---|
[caCORE:Name] |
[caCORE:Role in this project] |
=E2=80=94 |
This product uses the following technical components which have been der= ived from the current NCICB Technology Stack.
Client Interface |
|
---|---|
Application Server |
Jboss application server |
Database Server |
MySQL |
Operating System |
|
[caCORE:Other] |
=E2=80=94 |
This release is dependent on the caCORE components or products documente= d in the CORE = Product Dependency Matrix.
Items that are out of scope were evaluated as part of the initial scopin= g activities for this release, and subsequently not included in the final a= pproved scope. These items are also documented in the cumulative backlog of= requirements found on the product GForge site. They include out-of-scope f= unctional requirements (enhancements or new features), bug fixes, non-funct= ional requirements, and general support activities.
GForge number (hyperlinked) |
Brief description of item moved from the in-s=
cope section |
Iteration during which the item |
---|---|---|
Make use of logging consistent - elminate sys= tem out. We will address this if time permits |
=E2=80=94 |
|
The NCI_Thesaurus association Has_Salt_Form a= nd Has_Free_Acid_Or_Base needs reverse name. We will address this if = time permits. |
=E2=80=94 |
|
gov.nih.nci.evs.domain.Atom.getLUI does not r= eturn value. We will address this if time permits. |
=E2=80=94 |
|
Serializer Exception on org.apach.lucene.sear= ch.regenex. We will address this if time permits. |
=E2=80=94 |
Document Version: |
Click the Info tab. View the Recent Changes o= r click the link to view the page history. |
---|---|
Last Modified: |
Refer to the first line displayed in the docu= ment window. |
Project GForge site: |
LexEVS GForge project Docs archive, Files archive |
Most current version: |
Unless the display includes a notice that you= are viewing a previous version, you are viewing the most current version o= f this Scope Document for the release indicated in the title. |
Revision history: |
Click the Info tab. In the Recent Changes are= a, click the link to view the page history. |
Review history: |
Click the Info tab. In the Recent Changes are= a, note the developer who made each change and the date and time. Refer to = the Key People= Directory for their roles. Click the link to view any page or to view = the page history, and then click the link for a page. When the page opens, = view the comments and changes made in that version. |
Related documents: |
[caCORE:Name and URL of each related document= ] |
CBIIT Management |
Role |
Responsibilities |
---|---|---|
Frank Hartel |
Product Manager |
Oversees development of the product: features= , functions, definition of stakeholders, priorities within the scope, timef= rame for release |
Avinash Shanbhag |
Engineering Manager |
Oversees NCICB caCORE software engineering pr= actices, conducts design reviews, guides technical development |
Denise Warzel |
Product Line Manager |
Oversees NCICB caCORE product line. Responsib= le for overall product integration, major and minor release cycles. Support= s Product Manager. |