Page History
...
- The toolbar includes icons for bold and italic.
- The toolbar includes a carriage return symbol for creating a line break in the middle of a paragraph.
- The toolbar does not include a button for adding bulleted lists. When you need a bulleted list item, type an asterisk (*) at the beginning of a line of text.
- The toolbar includes a signature icon labeled "Your signature with timestamp." Click the icon to append your user name and add a date/time stamp to your comment.
Info title The check box at the bottom of the text entry box enables you to switch between a syntax-highlighted and standard editor. If your signature is pre-pending rather than appending, make sure that this box is not checked.
...
- Click on the "My workflow" tab at the top of the page.
- In the My Workflow Packages section, enter a name for the workflow package and click the Define Workflow Package button.
The Add Workflow Request: Workflow:{Package Name} opens. - Select a Priority option.
- Add a comment or instructions in the text entry box.
- Follow these steps in both the Structured Proposals and Unstructured Proposals sections:
- Click Add another.
- Enter the proposal name in the Proposal field.
- Repeat steps a and b to add more proposals.
- Click Save page.
The WorkFlow:{Package Name} page updates to show details about the package that you just submitted. This page includes the following informtion:- Submitter: Your user name
- Submission date: The submission date in numerical format
- Priority: The priority level that you assigned
- Proposal: Concepts included in the package
- Package status: The current workflow status for the package
- Facts about {Package Name}: A FactBox showing the workflow component, submission date, priority, and submitted name. The FactBox also provides a link to the RDF feed for the package.
- Categories: Shows the current status of the package. The initial status is WorkFlow Pending Receipt.
Structured Proposal Form Reference
...