NIH | National Cancer Institute | NCI Wiki  

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Wiki Markup
{scrollbar:icons=false}

...

This section outlines initial ideas about how the use cases realizations in the previous section could be linked to the technical (i.e. Semantic Infrastructure) services tentatively developed at the later stages of the Requirements Elicitation effort, and summarized in the Semantic Infrastructure Periodic Table. This table is posted on the Semantic Infrastructure Services page and shown in Figure 3.2.2-1 below. These technical services are included in the Functional Profile in the Periodic Table, and they will need to be invoked as part of the use case realizations.

...

Note that the use of UML ports is not necessary but was included in this paper as a basis for subsequent discussion for choice of notation. An alternative approach is to connect the provided interface directly to the components.

diagram showing SI Knowledge Management Services Used in the 21090 Use CaseImage Modified
Figure 3.2.2-2 SI Knowledge Management Services Used in the 21090 Use Case

...

Diagram showing the Translator toolkit in the narrative use description
Figure 3.2.2-4 Translation Services

...