Overview

The Knowledge Repository (KR) project will produce software components (tooling and services) that are part of the caBIG Semantic Infrastructure version 2 (SI v2). The role of KR components will be to address the (recently) expanded NCI stakeholder community's needs for defining and sharing static semantics. The Cancer Data Standards Repository (caDSR) has, since the inception of the caBIG program, been responsible for addressing static semantic needs. The KR project will therefore, subsume the responsibilities of the caDSR and address the additional needs of the expanded stakeholder community.

The scale of caBIG's mission has expanded in both size (from national to international) and scope (including BIG Health, beyond NCI cancer centers). In order to address the expanded size of the community, the architecture of KR service components will support collaboration and sharing of metadata among distributed, federated repositories through a set of service interfaces that are specified according to the Services-Aware Interoperability Framework (SAIF). In order to address the expanded scope of caBIG's mission, these services will support expression of additional contextual semantics by focusing on high-level information models, such as Domain Analysis Models (DAMs), for example BRIDG. This additional context supports the capturing of semantics that goes beyond what has been captured in caDSR to date.

Current Status

This project is currently (2010) working to defining the road map for transitioning from the current semantic infrastructure to the SI v2. The inputs to our work include the analysis of the Semantic Infrastructure Requirements Elicitation effort and the static semantic needs of projects/groups such as caEHR, CDISC SHARE, HL7 CIC, and others.

Project Summary

Vision Statement

Documentation

End User

Analysis

Technical

Management

Knowledge Repository Project Page
User Manual
Release Notes
Installation Guide
Developer Guide
API Document

Requirements Specification
Use Cases

Architecture Guide
CFSS
PSM
PIM

Vision
Scope
Roadmap
Project Plan
Work Breakdown Structure
Product Backlog
Spring Backlogs
Communication Plan
Test Plan
Risk Matrix

ECCF Matrix

Topic Specification

Enterprise/Business View

Computational View

Engineering View

Conceptual

Business Context,
Reference Context

Domain Analysis Information Model

Existing Platform Capabilities

Platform Independent

Business Governance

Project-oriented Information Model,
Constrained Information Model,
Localized Information Model,
Hierarchical Message Definition

Existing Platform Models

Platform Specific

Rules,
Procedures

Localized Information Model,
Transforms,
Schema

Execution Context,
Platform Bindings,
Deployment Model

ECCF Documentation

Document

Artifact

CFSS

Vision/Scope Document
Business Case Document
Use Case Model
Analysis Model
Design Model
Information Model
Architectural Diagrams/Document/Models
User Interface Model
Conformance Statements
Standards Documents
Glossaries

PIM

TBD

PSM

TBD

Deliverable Schedule

Phase

Date

Milestones

Deliverables

Inception

4/1/2010 (month 1)

v0 CFSS, use cases, requirements matrix

Project Management Plan (revised)
Monthly Status Report
Software Code Base

Elaboration

5/1/2010 (month 2)

v0 PIM, scope document
v1 CFSS, use cases, requirements matrix

Monthly Status Report
Software Code Base

 

6/1/2010 (month 3)

final CGSS, use cases, requirements matrix
v2 PIM, scope document

Monthly Status Report
Software Code Base

 

7/1/2010 (month 4)

final PIM, scope document
v0 PSM
Design Review

Monthly Status Report
Draft Design Review Package (draft)
Software Code Base
Test Package (draft)
Test Plan (draft)
Test Report (draft)
ECCF Documentation (draft)
caBIG Compatibility Package (draft)

Construction

8/1/2010 (month 5)

v1 PSM
v0 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

9/1/2010 (month 6)

v2 PSM
v1 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

10/1/2010 (month 7)

final PSM
v2 MDR, Model, and KM reference implementations
v0 integration test report
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

11/1/2010 (month 8)

v3 MDR, Model, and KM reference implementations
v1 integration test report

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
caBIG Compatibility Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

 

12/1/2010 (month 9)

final MDR, Model, and KM reference implementations
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

 

1/1/2011 (month 10)

bug fixes

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

Transition

2/1/2011 (month 11)

candidate release MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Project Summary Report (draft)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
Section 508 Compliance Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

 

3/1/2011 (month 12)

final release

Monthly Status Report
Draft Design Review Package (updated)
Project Management Plan (final)
Project Summary Report (final)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (final)
Installation Package  (final)
Release Notes  (final)
Installation Guide  (final)
Software Product Documentation  (final)
Product Demonstration  (final)
ECCF Documentation (updated)
caBIG Compatibility Package (final)
Section 508 Compliance Package (final)
BDA Compliance Package (final)
Compliance Matrix (final)
BDA Feedback Report   (final)
Product Install QA Report   (final)
BDA Software Test Plan and Scenarios  (final)
BDA Software Test Results   (final)
BDA Software Code   (final)

Deliverable Artifacts

...

Deliverable

...

4/10

...

5/10

...

6/10

...

7/10

...

8/10

...

9/10

...

10/10

...

11/10

...

12/10

...

1/11

...

2/11

...

3/11

...

Project Management Plan

...

Revised

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Final

...

Software Code Base

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

Draft

...

RC

...

Final

...

Monthly Status Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Report

...

Draft Design Review Package

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Final

...

Test Package

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Final

...

Test Plan

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Final

...

Test Report

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Final

...

ECCF Documentation

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Revised

...

Final

...

caBIG Compatibility Package

...

 

...

 

...

 

...

Draft

...

 

...

 

...

 

...

Revised

...

 

...

 

...

Final

...

Deployment Package

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Final

...

Installation Package

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Final

...

Release Notes

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Final

...

Installation Guide

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Final

...

Software Product Documentation

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Revised

...

Revised

...

Revised

...

Final

...

BDA Compliance Package

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

BDA Compliance Matrix

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

BDA Feedback Report

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

Product Install QA Report

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

BDA Software Test Plan and Scenarios

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

BDA Software Test Results

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

BDA Software Code

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

 

...

 

...

Revised

...

Final

...

Section 508 Compliance Package

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Draft

...

Final

Team

Role

Member

Project Director

Joshua Phillips

Project Manager

Beate Mahious

Subject Matter Expert

Ram Chilukuri

Architect

Tom Digre

Lead Business Analyst

TBN

Senior Business Analyst

Patrick McConnell

Senior Software Engineer

TBN

Software Engineer

TBN

Quality Assurance Engineer

TBN

Technical Writer

TBN

Project Planning

Management

Meetings

...