NIH | National Cancer Institute | NCI Wiki  

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

...

Page info
title
title

Section
 
Column
width45%
 
Panel
titleContents of this Page
Table of Contents
minLevel2
Panel
titleDocument Information

Author: Traci

:title} {section} {column:width=45%} {panel:title=Contents of this Page} {toc:minLevel=2} {panel} {panel:title=Document Information} *Author:* Traci

St.Martin/Tom

Johnson

*


Email:

*

stmartin.traci@mayo.edu

*


Team:

*

LexEVS

*


Contract:

*

28SX112

*


Client:

*

NCI

CBIIT


National

Institutes

of

Heath


US

Department

of

Health

and

Human

Services {panel} || Sign off || Date || Role \\ || CBIIT or Stakeholder Organization \\ || | Hartel | 10/21 \\ | Product Manager | NCI EVS \\ | | Fragoso |---|--- | NCI EVS | | Beasley | 10/30 \\ | Overall EVS Technical Lead | NCI EVS \\ | | Griffin | --- | Overall EVS Project Manager | NCI EVS \\ | | Lucas | 10/30 | Project Manager | NCI EVS | The *purpose of this document* is to collect, analyze, and define high-level needs and features of the National Cancer Institute Center for Biomedical Informatics and Information Technology (NCI CBIIT) caCORE EVS Release 4.3. This document focuses on the functionalities proposed by the product stakeholders and target users in order to make it a better product. The use-case and supplementary specifications document will detail how the framework will fulfill these needs. h2. Vision and Needs The *objective of this release* of the LexEVS 4.2.1 is to deliver any critical bux fixes and be used to deprecate EVS 4.0 support and give notice to users of the pending deprecation of the 3.2 API and EVS 4.1.  We will also look into piloting the BDA process. h3. Current Solution LexEVS 4.2 h3. Proposed Solutions Maintain 4.2 code base but deprecate EVS 4.0. h2. Functional Requirements Each enhancement, modification or new feature is described in detail below. || GForge number \\ (hyperlinked) || Brief description of functional requirement \\ (enhancement or new feature) \\ || Iteration \\ (Approved or Proposed) \\ || | [17198|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17198&group_id=491&atid=1904] | Pilot BDA process |--- | | [17199|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17199&group_id=491&atid=1904] | Tag the API classes as deprecated |--- | | [17670|https://gforge.nci.nih.gov/tracker/?func=detail&group_id=491&aid=17670&atid=1850] | DAO is throwing a ClassCastException when attempting access MedDRA |--- | h2. Functional Bug Fixes Each bug fix included in this release is described in detail below. || GForge number \\ (hyperlinked) || Brief description of bug \\ || Iteration \\ (Approved or Proposed) \\ || |--- | TBD - critical fixes only |--- | h2. Non-Functional Requirements This section describes in detail all the related requirements which must be met for this release but do not add functionality. These requirements are included in the scope and project plan due to level of effort or relative importance to the overall success of delivery of the release. || GForge number (hyperlinked) || Brief description of non-functional requirement \\ || Iteration \\ (Approved or Proposed) \\ || | [17072|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17072&group_id=491&atid=1904] | Project plan for 4.3 |--- | | [17073|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17073&group_id=491&atid=1904] | Release notes for 4.3 |--- | | [17074|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17074&group_id=491&atid=1904] | Update Tech and Admin Guides for 4.3 |--- | | [17087|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17087&group_id=491&atid=1904] | Deploy to NCI Dev tier |--- | | [17088|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17088&group_id=491&atid=1904] | Deploy to QA tier |--- | | [17089|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17089&group_id=491&atid=1904] | Deploy to Stage tier |--- | | [17090|https://gforge.nci.nih.gov/tracker/index.php?func=detail&aid=17090&group_id=491&atid=1904] | Deploy to Production tier |--- | h2. General Support Activities This section describes in detail all the related activities which must be performed for this release but do not add functionality. These activities are included in the scope and project plan due to level of effort or relative importance to the overall success of delivery of the release. || GForge number (hyperlinked) || Brief description of general support activity || Iteration \\ (Approved or Proposed) || | [17939|http://gforge.nci.nih.gov/tracker/?func=detail&atid=1904&aid=17939&group_id=491] | MySQL 5.0.45 upgrade |--- | h2. Stakeholder Summary || Name \\ || Role \\ || Interest/Need \\ || | George Komatsoulis | NCICB Application Infrastructure \\ | Oversees NCICB Application Infrastructure | | Avinash Shanbhag | NCICB Application Infrastructure | Oversees NCICB caCORE Software Engineering | | Frank Hartel | EVS Product Manager | Directs EVS Projects | | Johnita Beasley | Project Manager | Technical Direction and Implementation | | Gilberto Fragoso | Associate Director EVS Infrastructure | Technical Direction | | Denise Warzel | CORE Product Line Manager | Trans-CORE requirement coordination | | Thomas Johnson | Mayo Clinic Software Engineering Manager | Technical Direction and Implementation | | Jason Lucas | Project Manager | Project schedule and task management | | Traci St.Martin | Mayo Clinic Project Manager | Project Schedule and task Management | h2. Technical Environment This product uses the following technical components which have been derived from the current [NCICB Technology Stack|https://gforge.nci.nih.gov/docman/index.php?group_id=27&selected_doc_group_id=460&language_id=1]. || Component || Description || | Client Interface \\ | * NCI browsers * Programs accessing through caCORE/EVS APIs | | Application Server | JBoss Application server | | Database Server | MySQL | | Operating System \\ | * Windows 2000, XP * Unix (Sun Solaris) | | \[caCORE:Other\] |--- | h2. Product Dependencies This release is dependent on the caCORE components or products documented in the [caCORE:caCORE Tools Dependency Matrix]. \[caCORE:Provide additional explanation as applicable. For example, "The EVS vocabulary systems are used by the Java client to retrieve and validate concept information for naming and defining meanings."\] h2. Out of Scope Items Items that are out of scope were evaluated as part of the initial scoping activities for this release, and subsequently not included in the final approved scope. These items are also documented in the cumulative backlog of requirements found on the product GForge site. They include out-of-scope functional requirements (enhancements or new features), bug fixes, non-functional requirements, and general support activities. || GForge number (hyperlinked) || Brief description of item moved from the in-scope section \\ with brief explanation added of why it was not included in this release \\ || Iteration during which the item \\ was removed from in-scope \\ || |--- |--- |--- | h2. Document History || Item || Information || | *Document Version:* \\ | Click the Info tab. View the Recent Changes or click the link to view the page history. \\ | | *Last Modified:* \\ | Refer to the first line displayed in the document window. \\ | | *Project GForge site:* \\ | [https://gforge.nci.nih.gov/projects/lexevs/] | | *Most current version:* \\ | Unless the display includes a notice that you are viewing a previous version, you are viewing the most current version of this Scope Document for the release indicated in the title. \\ | | *Revision history:* \\ | Click the Info tab. In the Recent Changes area, click the link to view the page history. \\ | | *Review history:* \\ | Click the Info tab. In the Recent Changes area, note the developer who made each change and the date and time. Refer to the [Key People Directory|https://wiki.nci.nih.gov/x/Cg5y] for their roles. Click the link to view any page or to view the page history, and then click the link for a page. When the page opens, view the comments and changes made in that version. \\ | | *Related documents:* \\ | \[caCORE:Name and URL of each related document\] \\ | h2. Project Information || CBIIT Management \\ ||Role || Responsibilities || | Frank Hartel | Product Manager \\ | Oversees development of the product: features, functions, definition of stakeholders, priorities within the scope, timeframe for release \\ | | Avinash Shanbhag \\ | Engineering Manager \\ | Oversees NCICB caCORE software engineering practices, conducts design reviews, guides technical development \\ | | Denise Warzel \\ | Product Line Manager \\ | Oversees NCICB caCORE product line. Responsible for overall product integration, major and minor release cycles. Supports Product Manager. \\ | \\ {scrollbar:icons=false}

Services

Sign off

Date

Role

CBIIT or Stakeholder Organization

Hartel

10/21

Product Manager

NCI EVS

Fragoso

NCI EVS

Beasley

10/30

Overall EVS Technical Lead

NCI EVS

Griffin

Overall EVS Project Manager

NCI EVS

Lucas

10/30

Project Manager

NCI EVS

The purpose of this document is to collect, analyze, and define high-level needs and features of the National Cancer Institute Center for Biomedical Informatics and Information Technology (NCI CBIIT) caCORE EVS Release 4.3. This document focuses on the functionalities proposed by the product stakeholders and target users in order to make it a better product. The use-case and supplementary specifications document will detail how the framework will fulfill these needs.

Vision and Needs

The objective of this release of the LexEVS 4.2.1 is to deliver any critical bux fixes and be used to deprecate EVS 4.0 support and give notice to users of the pending deprecation of the 3.2 API and EVS 4.1.  We will also look into piloting the BDA process.

Current Solution

LexEVS 4.2

Proposed Solutions

Maintain 4.2 code base but deprecate EVS 4.0.

Functional Requirements

Each enhancement, modification or new feature is described in detail below.

GForge number
(hyperlinked)

Brief description of functional requirement
(enhancement or new feature)

Iteration
(Approved or Proposed)

17198

Pilot BDA process

17199

Tag the API classes as deprecated

17670

DAO is throwing a ClassCastException when attempting access MedDRA

Functional Bug Fixes

Each bug fix included in this release is described in detail below.

GForge number
(hyperlinked)

Brief description of bug

Iteration
(Approved or Proposed)

TBD - critical fixes only

Non-Functional Requirements

This section describes in detail all the related requirements which must be met for this release but do not add functionality. These requirements are included in the scope and project plan due to level of effort or relative importance to the overall success of delivery of the release.

GForge number (hyperlinked)

Brief description of non-functional requirement

Iteration
(Approved or Proposed)

17072

Project plan for 4.3

17073

Release notes for 4.3

17074

Update Tech and Admin Guides for 4.3

17087

Deploy to NCI Dev tier

17088

Deploy to QA tier

17089

Deploy to Stage tier

17090

Deploy to Production tier

General Support Activities

This section describes in detail all the related activities which must be performed for this release but do not add functionality. These activities are included in the scope and project plan due to level of effort or relative importance to the overall success of delivery of the release.

GForge number (hyperlinked)

Brief description of general support activity

Iteration
(Approved or Proposed)

17939

MySQL 5.0.45 upgrade

Stakeholder Summary

Name

Role

Interest/Need

George Komatsoulis

NCICB Application Infrastructure

Oversees NCICB Application Infrastructure

Avinash Shanbhag

NCICB Application Infrastructure

Oversees NCICB caCORE Software Engineering

Frank Hartel

EVS Product Manager

Directs EVS Projects

Johnita Beasley

Project Manager

Technical Direction and Implementation

Gilberto Fragoso

Associate Director EVS Infrastructure

Technical Direction

Denise Warzel

CORE Product Line Manager

Trans-CORE requirement coordination

Thomas Johnson

Mayo Clinic Software Engineering Manager

Technical Direction and Implementation

Jason Lucas

Project Manager

Project schedule and task management

Traci St.Martin

Mayo Clinic Project Manager

Project Schedule and task Management

Technical Environment

This product uses the following technical components which have been derived from the current NCICB Technology Stack.

Component

Description

Client Interface

  • NCI browsers
  • Programs accessing through caCORE/EVS APIs

Application Server

JBoss Application server

Database Server

MySQL

Operating System

  • Windows 2000, XP
  • Unix (Sun Solaris)

[caCORE:Other]

Product Dependencies

This release is dependent on the caCORE components or products documented in the Legacy caDSR Technology Dependency Matrix.

[caCORE:Provide additional explanation as applicable. For example, "The EVS vocabulary systems are used by the Java client to retrieve and validate concept information for naming and defining meanings."]

Out of Scope Items

Items that are out of scope were evaluated as part of the initial scoping activities for this release, and subsequently not included in the final approved scope. These items are also documented in the cumulative backlog of requirements found on the product GForge site. They include out-of-scope functional requirements (enhancements or new features), bug fixes, non-functional requirements, and general support activities.

GForge number (hyperlinked)

Brief description of item moved from the in-scope section
with brief explanation added of why it was not included in this release

Iteration during which the item
was removed from in-scope

Document History

Item

Information

Document Version:

Click the Info tab. View the Recent Changes or click the link to view the page history.

Last Modified:

Refer to the first line displayed in the document window.

Project GForge site:

LexEVS GForge project Docs archive, Files archive

Most current version:

Unless the display includes a notice that you are viewing a previous version, you are viewing the most current version of this Scope Document for the release indicated in the title.

Revision history:

Click the Info tab. In the Recent Changes area, click the link to view the page history.

Review history:

Click the Info tab. In the Recent Changes area, note the developer who made each change and the date and time. Refer to the Key People Directory for their roles. Click the link to view any page or to view the page history, and then click the link for a page. When the page opens, view the comments and changes made in that version.

Related documents:

[caCORE:Name and URL of each related document]

Project Information

CBIIT Management

Role

Responsibilities

Frank Hartel

Product Manager

Oversees development of the product: features, functions, definition of stakeholders, priorities within the scope, timeframe for release

Avinash Shanbhag

Engineering Manager

Oversees NCICB caCORE software engineering practices, conducts design reviews, guides technical development

Denise Warzel

Product Line Manager

Oversees NCICB caCORE product line. Responsible for overall product integration, major and minor release cycles. Supports Product Manager.