Use Case - Automated review
Use Case Number |
Initpm7.SD200.1 |
---|---|
Brief Description |
This use case describes the automated review of XMI submitted by developers using Business Process Management (BPM) tool |
Actor(s) for this particular use case |
Developers |
Pre-condition |
The developers are ready with the UML model and an annotated xmi |
Post condition |
Automated emails are generated informing the stakeholders of the result from SIW run |
Steps to take |
1. Developers have the complete submission package |
Alternate Flow |
None |
Priority |
High |
Associated Links |
|
Fit criterion/Acceptance Criterion |
SIW run for a given XMI is automated |
Init1pm7.SD200.3-Automate model upload on Sandbox
Use Case Number |
Init1pm7.SD200.3 |
---|---|
Brief Description |
This use case describes the automated upload of model submitted by developers using BPM to caDSR sandbox |
Actor(s) for this particular use case |
Developers |
Pre-condition |
1) The developers have approved the XMI after recieving it from the EVS team |
Post condition |
Metadata available on caDSR Sandbox |
Steps to take |
1.Developers log in to the BPM and submit the XMI |
Alternate Flow |
None |
Priority |
High |
Associated Links |
|
Fit criterion/Acceptance Criterion |
Uploading on caDSR is automated |
Init1pm7.SD200.4-Automate caDSR model submission on production
Use Case Number |
Init1pm7.SD200.4 |
---|---|
Brief Description |
This use case describes automated upload process to caDSR production |
Actor(s) for this particular use case |
none |
Pre-condition |
1) The Model owners have reviewed and approved the metadata on caDSR sandbox |
Post condition |
Metadata is available on Production |
Steps to take |
1. The BPM tool understands that model owners have approved model on caDSR sandbox and uploads it to production |
Alternate Flow |
None |
Priority |
High |
Associated Links |
|
Fit criterion/Acceptance Criterion |
|