NIH | National Cancer Institute | NCI Wiki  

Error rendering macro 'rw-search'

null

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Analysis / Development of Formal Requirement Statement:

Item

Description

Information/Response

Date:| (MM/DD/YYYY)


Requirement # |unique id <SemConOps Initiative>.<analysts initials><requirement number>
e.g. Init1dbw1
(eventually linked to Use Cases)

 

Originator/Customer's Name:

                                                                                        

Summary of requirement initial analysis, by Reviewer: (as unambiguously as possible, describe who (List of Actors) is interacting with the system, what the business goal is and how the system might support the actor's ability to acheive their goal)

 

Recommended Next Step Enter one: Follow-up interview, Observe, Use Case Template (text), Use Case Model (formalized/UML diagram), Group Discussion, Prototype, Waiting Room

 

Stakeholder Community:

Enter appropriate category of stakeholder from Primary Stakeholders:  

  • Software and Application designers and architects
  • Software and Application engineers and developers
  • Scientific and medical researchers
  • Medical research protocol designers
  • Clinical and scientific research data and metadata managers
  • Clinicians
  • Patients
  • Medical research study participants
  • Broader Stakeholders: caBIG® Community WS NIH projects and related commercial COTS vendors (caEHR, SDO's (HL7, CDISC); International Collaborators (e.g NCRI, cancerGrid, China), Government and regulatory bodies (FDA, CDC, ONC)
    (link to view SemConOps Stakeholders description_)._



Requirement Type (required)

Analyst's assessement of the most appropriate category/type of requirement (no need to ask interviewee):

  • Functional: Fundamental or essential to the product - describes what the product has to do or what processing is needed
  • Nonfunctional: properties the functions must have such as performance, usability, training or documentation
    • Project constraint: schedule or budget constraints
    • *Design constraint:*impose restrictions on how the product must be designed, such as conformant to ISO 11179, utilizes 21090 or is able to work on a particular type of device
    • Project driver: business-related forces such as descriptions of stakeholders or purpose of the product/project
    • Project issue: conditions that will contribute to the success or failure of the project

                                               

ConOp Initiative(s)
Requirements Analyst/Business Analyst

  • Select most appropriate initiative: (click for descriptions) 
  • Initiative 1 - Distributed, federated metadata repositories and model repositories and operations
  • Initiative 2 - Automated generation of metadata from line-of-business artifacts
  • Initiative 3 - Rules management and contracts support (behavioral semantics)
  • Initiative 4 - Semantics support for W3C service oriented architecture resources
  • Initiative 5 - HL7 CTS II/ OMG MIF compliant federated terminology services
  • Initiative 6 - Controlled biomedical terminology, ontology and metadata content
  • Initiative 7 - Assessment of semantic unification of compositional and derivational models
  • Initiative 8 - Other

 

High Level Use Case Summary)
Requirements Analyst/Business Analyst

Please write a short descriptive narrative use case; the steps or activities in this use case are usually the things the user wants to accomplish with the system (user/actor's goals).  

 

Use Case Linkage (required)
Business Analyst

Which use case(s) is this requirement linked to?  (should follow Use Case numbering scheme <SemCon Ops Initiative>.<analysts initials><requirement number>.<use case number>, for example Init1dbw1.1, Init1dbw1.2, Init2dbw2.1, 2.2, etc.

Use case Number(s):

Conflicts / Dependencies(required)
Requirements Analyst/ Business Analyst

Are there any conflicts with other requirements / use cases? 

Yes OR No - If yes, what and why?

Next Step (required)
(Requirement Analyst / Business Analyst)

After reviewing the results of the interview, the forum, and all other materials related to this requirement, the analyst should recommend the next step, then attach the Tiny Link (on the Info tab) for this page to the Master List table.

Enter one: Follow-up interview, Observe, Use Case Template (text), Use Case Model (formalized/UML diagram), Group Discussion, Prototype, Waiting Room

  • No labels