Project Summary

Background

Unable to render {include} The included page could not be found.

Vision Statement

Unable to render {include} The included page could not be found.

Documentation

End User

Analysis

Technical

Management

Knowledge Repository Project Page
User Manual
Release Notes
Installation Guide
Developer Guide
API Document

Requirements Specification
Use Cases

Architecture Guide
CFSS
PSM
PIM

Vision and Scope
Roadmap
Project Plan
Work Breakdown Structure
Product Backlog
Sprint Backlogs
Communications Plan
Test Plan
Risk Matrix

ECCF Matrix

Topic Specification

Enterprise/Business View

Computational View

Engineering View

Conceptual

Business Context,
Reference Context

Domain Analysis Information Model

Existing Platform Capabilities

Platform Independent

Business Governance

Project-oriented Information Model,
Constrained Information Model,
Localized Information Model,
Hierarchical Message Definition

Existing Platform Models

Platform Specific

Rules,
Procedures

Localized Information Model,
Transforms,
Schema

Execution Context,
Platform Bindings,
Deployment Model

ECCF Documentation

Document

Artifact

CFSS

Vision/Scope Document
Business Case Document
Use Case Model
Analysis Model
Design Model
Information Model
Architectural Diagrams/Document/Models
User Interface Model
Conformance Statements
Standards Documents
Glossaries

PIM

TBD

PSM

TBD

Project Planning

We engage in Agile project development, where we focus on time-boxed iterations that result in a deployable, testable application at the end of each iteration. As part of the iterative development, we actively engage with stakeholders on a regular basis. This section describes our project plan and meeting schedule.

Management Approach

In line with our Agile development methodology, we have adopted a modified version of Scrum. Checkout our Product Backlog of prioritized features and our Sprint Backlogs.

For additional information, please view our Project Plan and Communications Plan.

Team

Role

Member

Project Director

Joshua Phillips

Project Manager

Beate Mahious

Subject Matter Expert

Ram Chilukuri

Architect

Tom Digre

Lead Business Analyst

TBN

Senior Business Analyst

Patrick McConnell

Senior Software Engineer

TBN

Software Engineer

TBN

Quality Assurance Engineer

TBN

Technical Writer

TBN

Meetings

We have a daily scrum from 1:00-1:15.  Contact the Project Manager if you feel you need the login details.

Deliverable Schedule

Phase

Date

Milestones

Deliverables

Inception

4/1/2010 (month 1)

v0 CFSS, use cases, requirements matrix

Project Management Plan (revised)
Monthly Status Report
Software Code Base

Elaboration

5/1/2010 (month 2)

v0 PIM, scope document
v1 CFSS, use cases, requirements matrix

Monthly Status Report
Software Code Base

 

6/1/2010 (month 3)

final CGSS, use cases, requirements matrix
v2 PIM, scope document

Monthly Status Report
Software Code Base

 

7/1/2010 (month 4)

final PIM, scope document
v0 PSM
Design Review

Monthly Status Report
Draft Design Review Package (draft)
Software Code Base
Test Package (draft)
Test Plan (draft)
Test Report (draft)
ECCF Documentation (draft)
caBIG Compatibility Package (draft)

Construction

8/1/2010 (month 5)

v1 PSM
v0 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

9/1/2010 (month 6)

v2 PSM
v1 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

10/1/2010 (month 7)

final PSM
v2 MDR, Model, and KM reference implementations
v0 integration test report
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

 

11/1/2010 (month 8)

v3 MDR, Model, and KM reference implementations
v1 integration test report

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
caBIG Compatibility Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

 

12/1/2010 (month 9)

final MDR, Model, and KM reference implementations
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

 

1/1/2011 (month 10)

bug fixes

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

Transition

2/1/2011 (month 11)

candidate release MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Project Summary Report (draft)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
Section 508 Compliance Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

 

3/1/2011 (month 12)

final release

Monthly Status Report
Draft Design Review Package (updated)
Project Management Plan (final)
Project Summary Report (final)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (final)
Installation Package  (final)
Release Notes  (final)
Installation Guide  (final)
Software Product Documentation  (final)
Product Demonstration  (final)
ECCF Documentation (updated)
caBIG Compatibility Package (final)
Section 508 Compliance Package (final)
BDA Compliance Package (final)
Compliance Matrix (final)
BDA Feedback Report   (final)
Product Install QA Report   (final)
BDA Software Test Plan and Scenarios  (final)
BDA Software Test Results   (final)
BDA Software Code   (final)

Deliverable Artifacts

Deliverable

4/10

5/10

6/10

7/10

8/10

9/10

10/10

11/10

12/10

1/11

2/11

3/11

Project Management Plan

Revised

 

 


 

 

 

 

 

 

 

Final

Software Code Base

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

RC

Final

Monthly Status Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Draft Design Review Package


 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Package

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Plan

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Report

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

ECCF Documentation

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

caBIG Compatibility Package

 

 

 

Draft

 

 

 

Revised

 


 

Final

Deployment Package

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Installation Package

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Release Notes

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Installation Guide

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Software Product Documentation

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

BDA Compliance Package

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Compliance Matrix

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Feedback Report

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

Product Install QA Report

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Test Plan and Scenarios

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Test Results

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Code

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

Section 508 Compliance Package

 

 

 

 

 

 

 

 

 

 

Draft

Final

Resources

The following are some resources that we have found useful in this project:

  • No labels