NIH | National Cancer Institute | NCI Wiki  

Error rendering macro 'rw-search'

null

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 13 Next »

Deliverables

Phase

Date

Milestones

Deliverables

Inception

4/1/2010 (month 1)

v0 CFSS, use cases, requirements matrix

KnowledgeRS:Project Management Plan
Monthly Status Report (emailed)
Software Code Base

Elaboration

5/1/2010 (month 2)

v0 PIM, scope document
v1 CFSS, use cases, requirements matrix

Monthly Status Report
Software Code Base

Elaboration

6/1/2010 (month 3)

final CGSS, use cases, requirements matrix
v2 PIM, scope document

Monthly Status Report
Software Code Base

Elaboration

7/1/2010 (month 4)

final PIM, scope document
v0 PSM
Design Review

Monthly Status Report
Draft Design Review Package (draft)
Software Code Base
Test Package (draft)
Test Plan (draft)
Test Report (draft)
ECCF Documentation (draft)
caBIG Compatibility Package (draft)

ECCF subsumes this. -Joshua Phillips


Construction

8/1/2010 (month 5)

v1 PSM
v0 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

Construction

9/1/2010 (month 6)

v2 PSM
v1 MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

Construction

10/1/2010 (month 7)

final PSM
v2 MDR, Model, and KM reference implementations
v0 integration test report
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
ECCF Documentation (updated)

Construction

11/1/2010 (month 8)

v3 MDR, Model, and KM reference implementations
v1 integration test report

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
caBIG Compatibility Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

Construction

12/1/2010 (month 9)

final MDR, Model, and KM reference implementations
tag for QA

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

Construction

1/1/2011 (month 10)

bug fixes

Monthly Status Report
Draft Design Review Package (updated)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)

  Construction

2/1/2011 (month 11)

candidate release MDR, Model, and KM reference implementations

Monthly Status Report
Draft Design Review Package (updated)
Project Summary Report (draft)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (draft)
Installation Package  (draft)
Release Notes  (draft)
Installation Guide  (draft)
Software Product Documentation  (draft)
Product Demonstration  (draft)
ECCF Documentation (updated)
Section 508 Compliance Package (draft)
BDA Compliance Package (draft)
Compliance Matrix  (draft)
BDA Feedback Report  (draft)
Product Install QA Report  (draft)
BDA Software Test Plan and Scenarios  (draft)
BDA Software Test Results  (draft)
BDA Software Code  (draft)

Transition

3/1/2011 (month 12)

final release

Monthly Status Report
Draft Design Review Package (updated)
Project Management Plan (final)
Project Summary Report (final)
Software Code Base
Test Package (updated)
Test Plan (updated)
Test Report (updated)
Deployment Package (final)
Installation Package  (final)
Release Notes  (final)
Installation Guide  (final)
Software Product Documentation  (final)
Product Demonstration  (final)
ECCF Documentation (updated)
caBIG Compatibility Package (final)
Section 508 Compliance Package (final)
BDA Compliance Package (final)
Compliance Matrix (final)
BDA Feedback Report   (final)
Product Install QA Report   (final)
BDA Software Test Plan and Scenarios  (final)
BDA Software Test Results   (final)
BDA Software Code   (final)

Artifacts

Deliverable

Artifacts

4/10

5/10

6/10

7/10

8/10

9/10

10/10

11/10

12/10

1/11

2/11

3/11

Project Management Plan

 


 

 


 

 

 

 

 

 

 


 

Management Plan

Revised

 

 

 

 

 

 

 

 

 

 

Final

 

WBS

Revised

 

 

 

 

 

 

 

 

 

 

Final

 

Project Plan

Revised

 

 

 

 

 

 

 

 

 

 

Final

Software Code Base

 

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

Draft

RC

Final

Monthly Status Report

 

Emailed

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Report

Draft Design Review Package

 


 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Package

 

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Plan

 

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

Test Report

 

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

ECCF Documentation

 

 

 

 

Draft

Revised

Revised

Revised

Revised

Revised

Revised

Revised

Final

caBIG Compatibility Package

 

 

 

 

Draft

 

 

 

Revised

 


 

Final

Deployment Package

 

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Installation Package

 

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Release Notes

 

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Installation Guide

 

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

Software Product Documentation

 

 

 

 

 

 

 

 

Draft

Revised

Revised

Revised

Final

BDA Compliance Package

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Compliance Matrix

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Feedback Report

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

Product Install QA Report

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Test Plan and Scenarios

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Test Results

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

BDA Software Code

 

 

 

 

 

 

 

 

Draft

 

 

Revised

Final

Section 508 Compliance Package

 

 

 

 

 

 

 

 

 

 

 

Draft

Final

  • No labels