NIH | National Cancer Institute | NCI Wiki  

Error rendering macro 'rw-search'

null

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Instructions

Follow the script instructions and record the information in the designated table cells. You may wish to make notes below the questions.

Pre Interview:

Item

Information/Response

Date

12/17/2009

Requirement # unique id <SemCon Ops Initiative>.<analysts initials><requirement number>
e.g. Init1dbw1
(eventually linked to Use Cases)

Init1pm6

Originator/Customer's Name:

Ashwin Mathur : forum posting

Originator/Customer's Company:

Unknown

Stakeholder Community:
Enter appropriate category of stakeholder from Primary Stakeholders:  

  • Software and Application designers and architects
  • Software and Application engineers and developers
  • Scientific and medical researchers
  • Medical research protocol designers
  • Clinical and scientific research data and metadata managers
  • Clinicians
  • Patients
  • Medical research study participants
  • Broader Stakeholders: caBIG® Community WS NIH projects and related commercial COTS vendors (caEHR, SDO's (HL7, CDISC); International Collaborators (e.g NCRI, cancerGrid, China), Government and regulatory bodies (FDA, CDC, ONC)
    (link to view SemConOps Stakeholders decription).
  • Clinical and scientific research data and metadata managers
  • Software and Application engineers and developers

Summary of requirement pre-interview, by Reviewer:

There needs to be a mechanism for Software Engineers themselves to create metadata in a sandbox repository (i.e. let them load their model themselves).  However, it would then be the responsibility of the Metadata Curator to promote the metadata to the next tier (i.e. production).
Note: this is linked to Init1pm5 - Data rollback functionality

Recommended Next Step Enter one: Follow-up interview, Observe, Use Case Template (text), Use Case Model (formalized/UML diagram), Group Discussion, Prototype, Waiting Room

Use Case Model

Post Interview - ongoing throughout development of use cases:

Item

Description

Information/Response

Requirement Type (required)

Analyst's assessement of the most appropriate category/type of requirement (no need to ask interviewee):

  • Functional: Fundamental or essential to the product - describes what the product has to do or what processing is needed
  • Nonfunctional: properties the functions must have such as performance, usability, training or documentation
    • Project constraint: schedule or budget constraints
    • Design constraint: impose restrictions on how the product must be designed, such as conformant to ISO 11179, utilizes 21090 or is able to work on a particular type of device
    • Project driver: business-related forces such as descriptions of stakeholders or purpose of the product/project
    • Project issue: conditions that will contribute to the success or failure of the project

                                                

ConOp Initiative(s)
Requirements Analyst/Business Analyst

 

Use Case Linkage (required)
Business Analyst

Which use case(s) is this requirement linked to?  (should follow Use Case numbering scheme <SemCon Ops Initiative>.<analysts initials><requirement number>.<use case number>, for example Init1dbw1.1, Init1dbw1.2, Init2dbw2.1, 2.2, etc.

Use case Number(s):

Conflicts / Dependencies(required)
Requirements Analyst/ Business Analyst

Are there any conflicts with other requirements / use cases? 

Yes OR No - If yes, what and why?

Next Step (required)
(Requirement Analyst / Business Analyst)

After reviewing the results of the interview, the forum, and all other materials related to this requirement, the analyst should recommend the next step, then attach the Tiny Link (on the Info tab) for this page to the Master List table.

Enter one: Follow-up interview, Observe, Use Case Template (text), Use Case Model (formalized/UML diagram), Group Discussion, Prototype, Waiting Room

  • No labels