NIH | National Cancer Institute | NCI Wiki  

Error rendering macro 'rw-search'

null

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

 Attendees

NameRolePresent
Wright, Larry NIH/NCI  x
Fragoso, Gilberto NIH/NCI    x

De Coronado, Sherri    

NIH/NCI   x

Safran, Tracy

NIH/NCI   x
Ong, Kim L
ISx
Lucas, Jason R
ISx
Bauer, Scott  Mayox
Peterson, Kevin
Mayo 
Stancl, Craig
Mayox
Endle,  CoryMayox
Wynne, Robert    NIH/NCIx
Brem, Larry  NIH/NCI [C]   
Pan, JJ
NIH/NCI [E] 
Tran, Tin    NIH/NCI [C] x
Ahmed, Shamim
NIH/NC [C]  
Haber, Margaret (NIH/NCI) 
Roth, Laura (NIH/NLM)  
Ramani, Vivek (NIH/NCI) [C]  
Carlsen, Brian (NIH/NCI) [C] 
Wong, Joanne   

Kuntipuram, Kumar

  

 

Action Items

 #AssignedDescriptionDate IdentifiedDue DateDate CompletedStatus
54TracyWill try the NCI Thesaurus again. Check with DBA if necessary.  To follow up with Scott if this continues to load slowly.    done
64ScottTo follow up on URI's on OWL2 with Harold.   open
72ScottAdd release date to Release notes when appropriate   open
79Corycomplete security requirements   open
86TracyCreate a JIRA item for the REST call to return an association graph   done
88GilbertoCheck on options download page speed   done
89ScottInvestigate resumebatch – where and how does it pick up threads after failed loads   open
100ScottCheck into source code, namespace application for code queries, javadoc availability etc   open
101RobRecheck the load time issue for NCIt in one month (On next release of the NCIt)   open
102CraigTo follow up with Chris and Harold about when and where to include third parties in LexEVS planning   done
103ScottFollow up on 508 compliance for Bootstrap   done
104CraigTo flag tier deployment of 6.1.1 as optional   done
105ScottTo follow up on meeting over documentation review   done
106CraigConfirm and arrange meeting time for MedDRA review   open

Progress

6.1 QA and Deployment (Tin, Jason)Status.   Indexing seems to be an issue.  Metadata Index has a JIRA item we should potentially address.  Scott to find JIRA Item.
Face to Face plans (Craig)Discuss January dates 16th and 17th.  Consensus is the 16th and 17th.  Two full days.  One on framework and policy and another on operations and technical details.  Craig to check with Kumar and/or Larry Brem.
Widget progress (Scott)Update.  Scott to check into 508 details for Bootstrap. Report on tab-able items. No authoritative source of how compliant Bootstrap is.  Some evaluation and refactoring of code will be necessary to make this work. Application will stay at Mayo until 508 compliance is achieved.
Deployment Options page (Scott)Much slower in some areas.  No follow up required.
Meta Loader problemJIRA Item #596.  Scott to investigate whether the resumebatch will pick up the thread in question.  Temporary table also not always being cleaned up.  Issue of CUI's dying in a particular CUI load.  One thread fails and not always obviously failing.
Multiple Namespace reportCTS2 rest call has no namespace.   Multiple namespaces exist for some sets of codes.   Base NPO does not have multiple namespaces.  Scott will get the new version and test..  JIRA #597
Tree extensionNo code namespace available to adjust query here either.  Root node takes a namespace but the children api call get the tree fails.  Scott To follow up. JIRA #598
6.1 Documentation overviewStatus – are we satisfied with this?  Outside meeting preparation.  Splash page for CTS2 not able to penetrate very far.  Examples for namespace to go on wiki page.  Scott to set up a meeting with interested parties.
Thoughts on the release process and announcement

Don't want to release until documents are in order.  Question of URL's and use of 6.0 vs 6.1 in production.  End user acceptance starting this week on 6.1.    Quick search requires a new package – Scott to follow up.  The plan is to leave the 6.0 server up as default.  Create a 6.1 specific server address on production.  caGrid is updated to 2.0, but LexEVS is customized.  Need to evaluate whether or not LexEVS is compatible with a 2.0 client.  Action item for Scott to check with Kevin. 

 

 

JIRA Issues

Description
LEXEVS-570 - Getting issue details... STATUS
LEXEVS-572 - Getting issue details... STATUS
LEXEVS-573 - Getting issue details... STATUS
LEXEVS-574 - Getting issue details... STATUS
LEXEVS-576 - Getting issue details... STATUS
LEXEVS-579 - Getting issue details... STATUS
LEXEVS-583 - Getting issue details... STATUS
LEXEVS-584 - Getting issue details... STATUS
LEXEVS-585 - Getting issue details... STATUS
LEXEVS-586 - Getting issue details... STATUS
LEXEVS-587 - Getting issue details... STATUS
LEXEVS-588 - Getting issue details... STATUS
LEXEVS-589 - Getting issue details... STATUS
LEXEVS-592 - Getting issue details... STATUS
LEXEVS-593 - Getting issue details... STATUS
LEXEVS-594 - Getting issue details... STATUS
LEXEVS-595 - Getting issue details... STATUS
LEXEVS-596 - Getting issue details... STATUS
LEXEVS-597 - Getting issue details... STATUS
LEXEVS-598 - Getting issue details... STATUS

Project Plan Changes

#DescriptionDue DateResourcesNotesRisksMitigation
 None     
       
       

 Planned Activities

Area of InterestDetails
List of Issues, adjustmentsLoaders and smaller issues
Continue work on widgets 

Risks, Issues, Dependencies

Risks

Opened DateDue DateDescriptionLikelihood (H, M, L)ImpactAssignedStatusMitigation Strategy
110/10/2013 ShutdownH No work allowed.
CraigResolvedGovernment shutdown resolved.
         
         

Issues

 #Opened DateDescriptionImpactAssignedStatus
      
      
      

Dependencies

Opened DateDescriptionAssigned
   
   

 

 

 

 

  • No labels