Sprint 193
- Dates: Aug 18, 2022 - Aug 31, 2022 (2 weeks)
- Goal
- LexEVS Deployment Debugging
- LexEVS CTS2 Service update
- External support
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 192
- Dates: July 21, 2022 – Aug 17, 2022 (3 weeks)
- Goal:
- LexEVS Deployment Debugging
- Lexevs CTS2 Service update
- External support
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 191
- Dates: July 5, 2022 – July 20, 2022 (2 weeks)
- Goal:
- CTS2 Framework Spring Update
- Lexevs CTS2 Service update
- Statistics Dashboard
- External support
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 190
- Dates: June 30, 2022 – July 5, 2022 (2 weeks)
- Goal:
- Spring Update
- Statistics Dashboard
- External support
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 183
- Dates: March 24, 2021 – April 6, 2022 (2 weeks)
- Goal:
- Log4J fix - deploy to Stage/Prod
- LexEVS backlog issues
- Sumo Logic metrics statistics
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 182
- Dates: March 10, 2021 – March 23, 2022 (2 weeks)
- Goal:
- Log4J fix - deploy to Stage/Prod
- LexEVS backlog issues
- Sumo Logic metrics statistics
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 181
- Dates: February 24, 2021 – March 9, 2022 (2 weeks)
- Goal:
- Log4J fix - deploy to Stage/Prod
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 180
- Dates: February 10, 2021 – February 23, 2022 (2 weeks)
- Goal:
- Dashboard move to prod
- Log4J fix - deploy to QA
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 179
- Dates: January 27, 2021 – February 9, 2022 (2 weeks)
- Goal:
- Dashboard move to prod
- Log4J fix - deploy to QA
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 178
- Dates: January 13, 2021 – January 26, 2022 (2 weeks)
- Goal:
- Dashboard move to prod
- Log4J fix
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 177
- Dates: December 30, 2021 – January 12, 2022 (2 weeks)
- Goal:
- Dashboard move to prod
- Log4J fix
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 176
- Dates: December 16, 2021 – December 29, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 175
- Dates: December 2, 2021 – December 15, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 174
- Dates: November 18, 2021 – December 1, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 173
- Dates: November 4, 2021 – November 17, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 172
- Dates: October 21, 2021 – November 3, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 171
- Dates: October 7, 2021 – October 20, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 170
- Dates: September 23, 2021 – October 7, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Compare Tool
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 169
- Dates: September 9, 2021 – September 22, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 168
- Dates: August 26, 2021 – September 8, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 167
- Dates: August 12, 2021 – August 25, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 166
- Dates: July 29, 2021 – August 11, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 165
- Dates: July 15, 2021 – July 28, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 164
- Dates: July 1, 2021 – July 14, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 163
- Dates: June 18, 2021 – June 30, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- LexEVS backlog issues
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 162
- Dates: June 3, 2021 – June 17, 2021 (2 weeks)
- Goal:
- Dashboard investigation and prototyping
- Investigation of Power BI, Logstash
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 161
- Dates: May 20, 2021 – June 2, 2021 (2 weeks)
- Goal:
- QA Support for regression, progression issues
- Dashboard investigation and prototyping
- Investigation of Power BI, Logstash
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 160
- Dates: May 6, 2020 – May 19, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Dashboard investigation and prototyping
- Dashboard consultation and kickoff meeting
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 159
- Dates: April 21, 2020 – May 5, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Dashboard investigation
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 158
- Dates: April 8, 2020 – April 21, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Report Exporter new features
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 157
- Dates: March 25, 2020 – April 7, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Report Exporter new features
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 156
- Dates: March 11, 2020 – March 24, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Report Exporter new features
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 155
- Dates: February 25, 2020 – March 10, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 154
- Dates: February 11, 2020 – February 24, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 153
- Dates: January 28, 2020 – February 10, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 152
- Dates: January 14, 2020 – January 27, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer - deferred downloads
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 151
- Dates: December 31, 2020 – January 13, 2021 (2 weeks)
- Goal:
- Continue Working on Report Explorer - deferred downloads
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 150
- Dates: December 17, 2020 – December 30, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 149
- Dates: December 3, 2020 – December 16, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 148
- Dates: November 19, 2020 – December 2, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.3.RC2
- 6.5.4.3.RC2 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.4 branch up to and including 6.5.4.2.FINAL.
- This is a History loader update with the following fix:
- LEXEVS-5019 - OWL2 Loader removes extension from namespace in OWL one Loader
- LEXEVS-5020 - OWL2 Loader does not load rdfs:comments properly into Comment Object
- LEXEVS-5041 - OWL2 Loader doesn't properly handle language designations.
- LEXEVS-5046 - Update selected Loader Scripts to More Reasonable Default Heap Size
- Lexevs API (v6.5.4 branch)
Sprint 147
- Dates: November 5, 2020 – November 18, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.3 (loader fixes)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.3.RC1
- 6.5.4.3.RC1 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.4 branch up to and including 6.5.4.2.FINAL.
- This is a History loader update with the following fix:
- Lexevs API (v6.5.4 branch)
Sprint 146
- Dates: October 22, 2020 – November 4, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Build LexEVS 6.5.4.2 (History loader fix)
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.2.FINAL
- 6.5.4.2.FINAL Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.4 branch up to and including 6.5.4.1.FINAL.
- This is a History loader update with the following fix:
- Lexevs API (v6.5.4 branch)
Sprint 145
- Dates: October 9, 2020 – October 21, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 144
- Dates: September 24, 2020 – October 8, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 143
- Dates: September 10, 2020 – September 23, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.1.FINAL
- 6.5.4.1.FINAL Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.4 branch up to and including 6.5.4.FINAL.
- This is a Metathesaurus loader update with the following fix:
- Lexevs API (v6.5.4 branch)
Sprint 142
- Dates: August 27, 2020 – September 9, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 141
- Dates: August 13, 2020 – August 26, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 140
- Dates: July 30, 2020 – August 12, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 139
- Dates: July 16, 2020 – July 29, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 138
- Dates: July 2, 2020 – July 15, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 137
- Dates: June 18, 2020 – July 1, 2020 (2 weeks)
- Goal:
- Continue Working on Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.FINAL
- 6.5.4.FINAL Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.3 branch up to and including 6.5.3.FINAL.
- LexEVS 6.5.4 Release Notes
- Lexevs API (v6.5.4 branch)
- Lexevs Remote API (v6.5.4 branch)
- Lexevs service (v1.6.4 branch)
- 6.5.4.RC.2
- 6.5.4.RC.2 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.3 Release Notes
- Lexevs API (v6.5.4 branch)
- Lexevs Remote API (v6.5.4 branch)
Sprint 136
- Dates: June 4, 2020 – June 17, 2020 (2 weeks)
- Goal:
- Create Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 135
- Dates: May 21, 2020 – June 3, 2020 (2 weeks)
- Goal:
- Create initial Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 134
- Dates: May 7, 2020 – May 20, 2020 (2 weeks)
- Goal:
- Create initial structure and layout for Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 133
- Dates: April 23, 2020 – May 6, 2020 (2 weeks)
- Goal:
- Create Requirements for Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 132
- Dates: April 9, 2020 – April 22, 2020 (2 weeks)
- Goal:
- Build LexEVS Release Candidate
- Create Requirements for Report Explorer
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.4.RC.1
- 6.5.4.RC.1 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.3 Release Notes
- Lexevs API (v6.5.4 branch)
- Lexevs Remote API (v6.5.4 branch)
- Lexevs service (v1.6.4 branch)
Sprint 131
- Dates: March 26, 2020 – April 8, 2020 (2 weeks)
- Goal:
- Assist with graph db testing on Dev
- Create LexEVS DEV snapshot build for testing
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- SNAPSHOT.DEV.SPRINT131.2020.03.31 Build
- This build includes all LexEVS fix for loader issue:
- Lexevs API (dev branch)
- Git tag: SNAPSHOT.DEV.SPRINT131.2020.03.31
Sprint 130
- Dates: March 12, 2020 – March 25, 2020 (2 weeks)
- Goal:
- Assist with graph db testing on Dev
- Create LexEVS DEV snapshot build for testing
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- SNAPSHOT.DEV.SPRINT130.2020.03.12 Build
- This build includes all LexEVS updates.
- Lexevs API (dev branch)
- Git tag: SNAPSHOT.DEV.SPRINT130.2020.03.12
- Lexevs REMOTE API (dev branch)
- Git tag: SNAPSHOT.DEV.SPRINT130.2020.03.12
Sprint 129
- Dates: February 26, 2020 – March 11, 2020 (2 weeks)
- Goal:
- Assist with graph db testing on Dev
- Prepare for LexEVS release
- Provide continued support and issue resolution
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 128
- Dates: February 13, 2020 – February 26, 2020 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 127
- Dates: January 30, 2019 – February 12, 2020 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 126
- Dates: January 16, 2019 – January 29, 2020 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- SNAPSHOT.DEV.SPRINT126.2020.01.28 Build
- This build includes all graph resolve updates.
- Lexevs API (dev branch)
- Git tag: SNAPSHOT.DEV.SPRINT126.2020.01.28
- Graph Resolve (dev branch)
- Git tag: SNAPSHOT.DEV.SPRINT126.2020.01.28
Sprint 125
- Dates: January 2, 2019 – January 15, 2020 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 124
- Dates: December 19, 2019 – January 1, 2020 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 123
- Dates: December 5, 2019 – December 18, 2019 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 122
- Dates: November 21, 2019 – December 4, 2019 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 121
- Dates: November 7, 2019 – November 20, 2019 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 120
- Dates: October 24, 2019 – November 6, 2019 (2 weeks)
- Goal:
- Implement new hybrid text query/association API
- Add graph db tests to Jenkins
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 119
- Dates: October 10, 2019 – October 23, 2019 (2 weeks)
- Goal:
- Assist moving LexEVS 6.5.3 up to Stage/Prod
- Implement new hybrid text query/association API
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 118
- Dates: September 25, 2019 – October 9, 2019 (2 weeks)
- Goal:
- Assist moving LexEVS 6.5.3 up to Stage/Prod
- Implement new hybrid text query/association API
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 117
- Dates: September 12, 2018 – September 25, 2019 (2 weeks)
- Goal:
- Investigate Metathesaurus
- Assist QA with testing
- Implement new hybrid text query/association API
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.3.FINAL
- 6.5.3.FINAL Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.2 branch up to and including 6.5.2.FINAL.
- LexEVS 6.5.3 Release Notes
- Lexevs API (v6.5.3 branch)
- Lexevs Remote API (v6.5.2 branch)
- Lexevs service (v1.6.3 branch)
- URI Resolver (v1.1.1 branch)
Sprint 116
- Dates: August 29, 2018 – September 11, 2019 (2 weeks)
- Goal:
- DevOps - 6.5.3 release documentation
- Assist QA with testing
- Implement new hybrid text query/association API
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 115
- Dates: August 15, 2018 – August 28, 2019 (2 weeks)
- Goal:
- DevOps - 6.5.3 release documentation
- Assist QA with testing
- Investigate new hybrid text query/association API
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.3.RC.3
Sprint 114
- Dates: August 1, 2018 – August 14, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Assist QA with testing
- QA reported issue work
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.3.RC.3
- 6.5.3.RC.3 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.2 Release Notes - Not Released
- Lexevs API (v6.5.3 branch)
- Lexevs Remote API (v6.5.3 branch)
- Lexevs service (v1.6.3 branch)
Sprint 113
- Dates: July 18, 2018 – July 31, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Assist QA with testing
- QA reported issue work
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 112
Sprint 111
- Dates: June 20, 2018 – July 3, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Assist QA with testing
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 110
- Dates: June 6, 2018 – June 19, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Assist QA with testing
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- DEV SNAPSHOT
- SNAPSHOT.DEV.SPRINT110.2019.06.10 Build (Java 8/Tomcat 8 build)
- Lexevs API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT110.2019.06.10
- This build includes the following changes:
- Artifacts:
- Lexevs Remote API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT110.2019.06.10
- This build includes the following changes:
- LEXEVSREM-378 Update Tests to reflect source updated for LEXEVS-4552
- Artifacts:
Sprint 109
- Dates: May 23, 2018 – June 5, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Assist QA with testing
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- DEV SNAPSHOT
- SNAPSHOT.DEV.SPRINT109.2019.05.23 Build (Java 8/Tomcat 8 build)
- Lexevs API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT109.2019.05.23
- This build includes the following changes:
LEXEVS-3834 API: (Tree Extension) returns incorrect ontology_node_child_count.
LEXEVS-3465 API: Mapping Extension Iterator number remaining function fails
LEXEVS-4535 Restricting hierarchy implementation for Tree Extension Part 2
LEXEVS-3627 API: Need a convenience method for categorizing coding schemes by type.
LEXEVS-4527 Snapshot Release: Build Artifacts for DEV
- Artifacts:
- Lexevs Remote API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT109.2019.05.23
- This build includes the following changes:
- LEXEVSREM-367 Distributed API support for Mapping Extension Iterator issue
- LEXEVSREM-359Adding a new method to the LexEVSAPI for a convenience method
- Artifacts:
Sprint 108
- Dates: May 9, 2018 – May 23, 2019 (2 weeks)
- Goal:
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Assist QA with testing
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 107
- Dates: April 25, 2018 – May 8, 2019 (2 weeks)
- Goal:
- Finalize LexEVS 6.5.2 release documentation
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- DEV SNAPSHOT
- SNAPSHOT.DEV.SPRINT107.2019.05.02 Build (Java 8/Tomcat 8 build)
- This build includes loader changes for OBIB and subsequent tree hierarchy updates.
- LEXEVS-4535 Restricting hierarchy implementation for Tree Extension Part 2
- Fixes to previous snapthot build
- Lexevs API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT107.2019.05.02
- DEV SNAPSHOT
- SNAPSHOT.DEV.SPRINT107.2019.05.01 Build (Java 8/Tomcat 8 build)
- This build includes loader changes for OBIB and subsequent tree hierarchy updates.
- Lexevs API (v6.5.2 branch)
- Git tag: SNAPSHOT.DEV.SPRINT107.2019.05.01
Sprint 106
- Dates: April 11, 2018 – April 24, 2019 (2 weeks)
- Goal:
- Finalize LexEVS 6.5.2 release documentation
- DevOps - Dockerize LexEVS
- Tech Stack - Update LexEVS 3rd party software.
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 105
- Dates: March 28, 2018 – April 10, 2019 (2 weeks)
- Goal:
- 6.5.2.FINAL Delivered.
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.2.FINAL
- 6.5.2.FINAL Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1 branch up to and including 6.5.1.3.FINAL.
- LexEVS 6.5.2 Release Notes - Not Released
- Lexevs API (v6.5.2 branch)
- Git tag: 6.5.2.FINAL
- Lexevs Remote API (v6.5.2 branch)
- Git tag: 6.5.2.FINAL
- Lexevs service (v1.6.2 branch)
- Git tag:1.6.2.FINAL
- URI Resolver (v1.1.1 branch)
- Git tag: 1.1.1.FINAL
Sprint 104
- Dates: March 14, 2018 – March 27, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.6 testing
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 103
- Dates: February 28, 2018 – March 13, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.6 testing
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 102
- Dates: February 14, 2018 – February 27, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.6
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.2.RC.6
- 6.5.2.RC.6 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1 branch up to and including 6.5.1.3.FINAL.
- LexEVS 6.5.2 Release Notes - Not Released
- Lexevs API (v6.5.2 branch)
- Git tag: 6.5.2.RC.6
- Lexevs Remote API (v6.5.2 branch)
- Git tag: 6.5.2.RC.6
- Lexevs service (v1.6.2 branch)
- Git tag:1.6.2.RC.6
Sprint 101
- Dates: January 31, 2018 – February 13, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.5
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.2.RC.5
- 6.5.2.RC.5 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1 branch up to and including 6.5.1.3.FINAL.
- LexEVS 6.5.2 Release Notes - Not Released
- Lexevs API (v6.5.2 branch)
- Git tag: 6.5.2.RC.5
- Lexevs Remote API (v6.5.2 branch)
- Git tag: 6.5.2.RC.5
- Lexevs service (v1.6.2 branch)
- Git tag:1.6.2.RC.5
Sprint 100
- Dates: January 17, 2018 – January 30, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.3
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.2.RC.4
- 6.5.2.RC.4 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1 branch up to and including 6.5.1.3.FINAL.
- LexEVS 6.5.2 Release Notes
- Lexevs API (v6.5.2 branch)
- Git tag: 6.5.2.RC.4
- Lexevs Remote API (v6.5.2 branch)
- Git tag: 6.5.2.RC.4
- Lexevs service (v1.6.2 branch)
- Git tag:1.6.2.RC.4
- RC3 Build
- 6.5.2.RC.3
- 6.5.2.RC.3 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1 branch up to and including 6.5.1.3.FINAL.
- LexEVS 6.5.2 Release Notes
- Lexevs API (v6.5.2 branch)
- Git tag: 6.5.2.RC.3
- Lexevs Remote API (v6.5.2 branch)
- Git tag: 6.5.2.RC.3
- Lexevs service (v1.6.2 branch)
- Git tag:1.6.2.RC.3
Sprint 99
- Dates: January 3, 2018 – January 16, 2019 (2 weeks)
- Goal:
- 6.5.2.RC.3
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 98
- Dates: December 20, 2018 – January 2, 2019 (2 weeks)
- Goal:
- LexEVS security vulnerabilities (flagged by Git)
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.3.FINAL (Includes 6.5.1.2 changes)
Sprint 97
- Dates: December 6, 2018 – December 19, 2018 (2 weeks)
- Goal:
- LexEVS security vulnerabilities (flagged by Git)
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.2.RC.1
Sprint 96
- Dates: November 22, 2018 – December 5, 2018 (2 weeks)
- Goal:
- LexEVS security vulnerabilities (flagged by Git)
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.2.FINAL (Includes 6.5.1.1 changes)
Sprint 95
- Dates: November 8, 2018 – November 21, 2018 (2 weeks)
- Goal:
- LexEVS security vulnerabilities (flagged by Git)
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 94
- Dates: October 25, 2018 – November 7, 2018 (2 weeks)
- Goal:
- LexEVS security vulnerabilities (flagged by Git)
- Loader issues
- API issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 93
- Dates: October 11, 2018 – October 24, 2018 (2 weeks)
- Goal:
- Loader issues
- API issues
- Post for F2F work
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
Sprint 92
- Dates: September 27, 2018 – October 10, 2018 (2 weeks)
- Goal:
- Loader issues
- API issues
- Prep for F2F meetings
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
Sprint 91
- Dates: September 13, 2018 – September 26, 2018 (2 weeks)
- Goal:
- Loader issues
- API issues
- Prep for F2F meetings
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.1.FINAL (Includes SNAPSHOT.3 changes)
Sprint 90
- Dates: August 30, 2018 – September 12, 2018 (2 weeks)
- Goal:
- Loader issues
- API issues
- Prep for F2F meetings
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.1.SNAPSHOT.3 (Includes SNAPSHOT.2 changes)
Lexevs API (6.5.1 branch)
Sprint 89
- Dates: August 16, 2018 – August 29, 2018 (2 weeks)
- Goal:
- Provide support for 6.5.1.FINAL LexEVS.
- Loader issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.1.SNAPSHOT.2 (Includes SNAPSHOT.1 changes)
- Lexevs API (6.5.1 branch)
- Git tag: 6.5.1.1.SNAPSHOT.2
- Changes for this SNAPSHOT (These changes do not need to go up the tier for approval):
- LEXEVS-4056 - Loader: Asserted Value Set to Value Set Definition Loader does not properly load Supported CodingSchemes
Sprint 88
- Dates: August 2, 2018 – August 15, 2018 (2 weeks)
- Goal:
- Provide support for 6.5.1.FINAL LexEVS.
- Loader issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.1.SNAPSHOT.1
- Lexevs API (6.5.1 branch)
- Git tag: 6.5.1.1.SNAPSHOT.1
- Changes for this SNAPSHOT (These changes do not need to go up the tier for approval):
- LEXEVS-3464 Loader: Sources for Properties are not loaded for Meta Thesaurus
- LEXEVS-3947 Loader: Implement supported qualifier for authority qualifier load
- LEXEVS-3973 GUI: lbGUI needs to initialize the AssertedValueSetParameters
Sprint 87
- Dates: July 19, 2018 – August 1, 2018 (2 weeks)
- Goal:
- Provide support for 6.5.1.FINAL LexEVS.
- Loader issues
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.1.SNAPSHOT.1
- 6.5.1.1.SNAPSHOT.1 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.1.FINAL release.
- Lexevs API (dev branch)
- Git tag: 6.5.1.1.SNAPSHOT.1
- Changes for this SNAPSHOT:
- LEXEVS-3464 Loader: Sources for Properties are not loaded for Meta Thesaurus
- LEXEVS-3947 Loader: Implement supported qualifier for authority qualifier load
- LEXEVS-3973 GUI: lbGUI needs to initialize the AssertedValueSetParameters
Sprint 86
- Dates: July 05, 2018 – July 18, 2018 (2 weeks)
- Goal:
- Provide a FINAL build to appscan on the QA tier.
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- 6.5.1.FINAL
Sprint 85
- Dates: June 21, 2018 – July 04, 2018 (2 weeks)
- Goal:
- Provide RC.2 build to test on QA tier
- Provide a FINAL build to appscan on the QA tier
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- RC.2 (LexEVS Remote API and LexEVS service)
Sprint 84
- Dates: June 7, 2018 – June 20, 2018 (2 weeks)
- Goal:
- Provide RC.1 build to test on QA tier
- Update LexEVS Wiki
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- RC.1
- RC.2
- 6.5.1.RC.2 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.7.FINAL.
- Lexevs API (dev branch)
- Git tag: 6.5.1.RC.2
- Changes for this Release Candidate:
Sprint 83
- Dates: May 24, 2018 – June 06, 2018 (2 weeks)
- Goal:
- Provide snapshot that is code complete
- Complete Value Set Architecture
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- SNAPSHOT.15
- SNAPSHOT.16
Sprint 82
- Dates: May 10, 2018 – May 23, 2018 (2 weeks)
- Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- SNAPSHOT.13
- 6.5.1.SNAPSHOT.13 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.7.FINAL.
- Lexevs API (dev branch)
- Git tag: 6.5.1.SNAPSHOT.13
- Changes for this snapshot:
- SNAPSHOT.14
Sprint 81
- Dates: April 26, 2018 – May 9, 2018 (2 weeks)
- Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- SNAPSHOT.12
Sprint 80
- Dates: April 12, 2018 – April 25, 2018 (2 weeks)
- Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
- Agile Board
- Sprint Report (includes issues/deliverables)
- Retrospective
- Artifacts
- SNAPSHOT.8
- SNAPSHOT.9
- SNAPSHOT.10
- SNAPSHOT.11
Sprint 79
Dates: March 29, 2018 – April 11, 2018 (2 weeks)
Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 78
Dates: March 15, 2018 – March 28, 2018 (2 weeks)
Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.5.1.SNAPSHOT.7 Build (Java 8/Tomcat 8 build)
This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.7.FINAL.Git tag: 6.5.1.SNAPSHOT.7- Lexevs Remote API (dev branch)
Git tag: 6.5.1.SNAPSHOT.7
Sprint 77
Dates: March 1, 2018 – March 14, 2018 (2 weeks)
Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.5.1.SNAPSHOT.6 Build (Java 8/Tomcat 8 build)
This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.7.FINAL.Git tag: 6.5.1.SNAPSHOT.6- Lexevs Remote API (dev branch)
Git tag: 6.5.1.SNAPSHOT.6
Sprint 76
Dates: February 15, 2018 – February 28, 2018 (2 weeks)
Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 75
Dates: February 1, 2018 – February 14, 2018 (2 weeks)
Goal:
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 74
Dates: January 18, 2018 – January 31, 2018 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 73
Dates: January 4, 2018 – January 17, 2018 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.7.FINAL Artifacts 6.5.0.7.FINAL Build (Java 8/Tomcat 8 build)
Sprint 72
Dates: December 21, 2017 – January 3, 2018 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Docker deployment
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 71
Dates: December 7, 2017 – December 20, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- F2F Preparation
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 70
Dates: November 23, 2017 – December 6, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- F2F Preparation
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 69
Dates: November 9, 2017 – November 22, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- F2F Preparation
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.1.SNAPSHOT.4 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.6.FINAL.
Lexevs API (dev branch)- Git tag: 6.5.1.SNAPSHOT.4Lexevs Remote API (dev branch)Git tag: 6.5.1.SNAPSHOT.4
Sprint 68
Dates: October 26, 2017 – November 8, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.1.SNAPSHOT.3 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.6.FINAL.
Lexevs API (dev branch)- Git tag: 6.5.1.SNAPSHOT.3
Sprint 67
Dates: October 12, 2017 – October 25, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.6.FINAL Artifacts 6.5.0.6.FINAL Build (Java 8/Tomcat 8 build)
6.5.1.SNAPSHOT.2 Build (Java 8/Tomcat 8 build)
- This build includes all changes from the LexEVS 6.5.0 branch up to and including 6.5.0.6.FINAL.
Lexevs API (dev branch)- Git tag: 6.5.1.SNAPSHOT.2Lexevs Remote API (dev branch)Git tag: 6.5.1.SNAPSHOT.2
Sprint 66
Dates: September 28, 2017 – October 11, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.5.FINAL Artifacts6.5.0.5.FINAL Build (Java 8/Tomcat 8 build)
Sprint 65
Dates: September 14, 2017 – September 27, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 64
Dates: August 31, 2017 – September 13, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.4.FINAL Artifacts
- 6.5.0.4.FINAL Build (Java 8/Tomcat 8 build)Lexevs API (v6.5.0 branch) Git tag: 6.5.0.4.FINAL
6.5.1.SNAPSHOT.1 Build (Java 8/Tomcat 8 build)
- Lexevs API (dev branch)
- Lexevs Remote API (dev branch)Git tag: 6.5.1.SNAPSHOT.1
- Lexevs service (v1.6.0 branch) - No changes. Use the 6.5.0 production version
Git tag: 1.6.0.FINAL - URI Resolver (v1.1.0 branch) - No changes. Use the 6.5.0 production version
Git tag: 1.1.0.FINAL
Sprint 63
Dates: August 17, 2017 – August 30, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.3.FINAL Artifacts
- 6.5.0.3.FINAL Build (Java 8/Tomcat 8 build)Lexevs API (v6.5.0 branch) Git tag: 6.5.0.3.FINAL
Sprint 62
Dates: August 3, 2017 – August 16, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 61
Dates: July 20, 2017 – August 02, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.5.0.2FINAL Artifacts
- 6.5.0.2.FINAL Build (Java 8/Tomcat 8 build)Lexevs API (v6.5.0 branch) Git tag: 6.5.0.2.FINAL
Sprint 60
Dates: July 06, 2017 – July 19, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 59
Dates: June 22, 2017 – July 05, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 58
Dates: June 8, 2017 – June 21, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.5.0.1.FINAL Artifacts6.5.0.1.FINAL Build (Java 8/Tomcat 8 build)Lexevs API (v6.5.0 branch) Git tag: 6.5.0.1.FINAL
Sprint 57
Dates: May 25, 2017 – June 7, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.5.0.1.RC.1 Artifacts6.5.0.1.RC.1 Build (Java 8/Tomcat 8 build)Lexevs API (v6.5.0 branch) Git tag: 6.5.0.1.RC.1
Sprint 56
Dates: May 10, 2017 – May 24, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.5.0.FINAL Artifacts
6.5.0.FINAL Build (Java 8/Tomcat 8 build)
Lexevs API (v6.5.0 branch)- Git tag: 6.5.0.FINAL
Lexevs Remote API (v6.5.0 branch)Git tag: 6.5.0.FINALLexevs service (v1.6.0 branch)Git tag: 1.6.0.FINAL
URI Resolver (v1.1.0 branch)Git tag: 1.1.0.FINAL
Sprint 55
Dates: April 27, 2017 – May 10, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 54
Dates: April 13, 2017 – April 26, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 53
Dates: March 30, 2017 – April 12, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Value Set Architecture
- REST Architecture
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
6.4.1.4.FINAL Artifacts
- 6.4.1.4 FINALGit tag: 6.4.1.4.FINAL
6.5.0.RC.1 Artifacts
- 6.5.0.RC.1 Build (Java 8/Tomcat 8 build)
Lexevs API (v6.5.0 branch)Git tag: 6.5.0.RC.1
Lexevs Remote API (v6.5.0 branch)Git tag: 6.5.0.RC.1Lexevs service (v1.6.0 branch)Git tag: 1.6.0.RC.1
URI Resolver (v1.1.0 branch)Git tag: 1.1.0.FINAL
Sprint 52
Dates: March 16, 2017 – March 29, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Loader issues
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 51
Dates: March 2, 2017 – March 15, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Loader issues
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- 6.4.1.3.1.RC Build (replaces 6.4.1.3.FINAL)
Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.1.RC
Sprint 50
Dates: February 16, 2017 – March 1, 2017 (2 weeks)
Goal:
- 6.5.0 Finalization
- Loader issues
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
6.4.1.3.FINAL Build
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.FINAL
- Lexevs Remote API (v6.4.0 branch)Git tag: 6.4.1.3.FINAL
- Release Identifiers for 6.4.1.3 build
6.5.0.SNAPSHOT.1 Build (Java 8/Tomcat 8 build)
- Lexevs API (dev branch)
- Lexevs Remote API (dev branch)Git tag: 6.5.0.SNAPSHOT.1
- Lexevs service (dev branch)Git tag: 1.5.2.SNAPSHOT.1
- URI Resolver (dev branch)Git tag: 1.0.0.FINAL
Sprint 49
Dates: February 2, 2017 – February 15, 2017 (2 weeks)
Goal:
- 6.4.2 Finalization
- Loader issues
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
6.4.1.3.SNAPSHOT Build (replaces 6.4.1.3.SNAPSHOT from sprint 48)
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.SNAPSHOT
Sprint 48
Dates: January 19, 2017 – February 1, 2017 (2 weeks)
Goal:
- Value set architecture planning
- 6.5.0 development
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
6.4.1.3.SNAPSHOT Build (replaces 6.4.1.3.SNAPSHOT from sprint 47)
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.SNAPSHOT
Sprint 47
Dates: January 5, 2017 – January 18, 2017 (2 weeks)
Goal:
LexEVS stress testing
- MySQL 5.6 performance testing/tuning
- Value set architecture planning
- 6.5.0 development
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
6.4.1.3.SNAPSHOT Build (replaces 6.4.1.3.SNAPSHOT from sprint 45)
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.SNAPSHOT
Sprint 46
Dates: December 22, 2016 – January 4, 2017 (2 weeks)
Goal:
LexEVS stress testing
- MySQL 5.6 performance testing/tuning
- 6.5.0 development
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 45
Dates: December 8, 2016 – December 21, 2016 (2 weeks)
Goal:
6.4.1.3 testing
- 6.5.0 development
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
6.4.1.3.SNAPSHOT Build
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.3.SNAPSHOT
Sprint 44
Dates: November 24, 2016 – December 7, 2016 (2 weeks)
Goal:
- F2F Meeting
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 43
Dates: November 10, 2016 – November 23, 2016 (2 weeks)
Goal:
- Provide tier deployment support.
- 6.4.1.2 and 6.4.1.3 support.
- 6.4.2 development.
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Sprint 42
Dates: October 27, 2016 – November 9, 2016 (2 weeks)
Goal:
- Provide tier deployment support.
- 6.4.1.2 and 6.4.1.3 development/deployment.
- 6.4.2 development.
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
FINAL Build
- Lexevs API (v6.4.0 branch)Git tag: 6.4.1.2.FINALLexevs CTS2 (for 6.4.1.2 - v1.5.0 branch)Artifact Name: lexevs-service-1.5.1.2.FINAL.war
Release Identifiers for 6.4.1.2 build
Updated PTEs
Sprint 41
Dates: October 13, 2016 – October 26, 2016 (2 weeks)
Goal:
- Provide tier deployment support.
- Build 6.4.1.1 fix.
- 6.5 planning and development.
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective
Artifacts
- FINAL BuildLexevs API (v6.4.0 branch)Git tag: 6.4.1.1.FINALArtifact Name: lexevs-service-1.5.1.1.FINAL.war
Release Identifiers for 6.4.1.1 build
Updated PTEs
Sprint 40
Dates: September 29, 2016 – October 12, 2016 (2 weeks)
Goal:
- Provide tier deployment support.
- 6.5 planning and development.
- Provide continued support and issue resolution.
Project Roadmap
Agile Board
Sprint Report (includes issues/deliverables)
Retrospective